31/01/2018
Remembering of ORC to SRC pipeline project in 2004.
Oman Refinery Co (ORC) was invested around US$119 million for the construction of a 266-km crude oil pipeline to provide feedstock for Sohar Refinery Co (SRC).
The 24-inch pipeline will go along Al Batinah coast from ORC's Mina Al Fahal facility to Sohar with required capacity of 116,000 barrels per day (bpd) of mixed Crude Oil and Long Residue.
This capacity was increased up to 160,000 bpd of Oman Export Blend Crude Oil.
We (Aram Control System & Technology Pte Ltd) involved withYokogawa Company, Singapore Stardom PLC/ Fast tool (HMI) for the development of PLC program & HMI system.
Now, the Yokogawa introduced new system in pipeline management, "Solution (EPMS) R1.03".
https://www.automation.com/portals/process-automation/process-instruments/yokogawa-introduces-enterprise-pipeline-management-solution-epms-r103
Developed for deployment at the heart of the pipeline operations management environment, the EPMS supplements a core SCADA platform with specific gas and liquid applications that enable a pipeline operator to manage delivery contracts and associated logistics.